
Traffic Control Measures for the Route 70/73 Marlton Circle Elimination Project
The Allowable Lane Closure Hours are as Follows:
Single lane closures, if required, are allowed based upon the following guidelines:
- Monday thru Sunday 9PM to 6AM the next day
Shoulder closure will be permitted at any time, except during the holiday periods.
Allowable complete roadway closure hours for the placement of bridge beams/overhead sign structures on Routes 70/73 are between the hours of 11 PM and 5 AM, Monday through Thursday for a maximum of 15 minute durations – holiday restrictions apply.
Stopped traffic shall be allowed to flow freely to the satisfaction of the Resident Engineer between successive 15-minute road closure periods.
Single lane closures will not be permitted on the following holidays:
- Easter Sunday (including 6:00AM Saturday until Noon Monday)
- Memorial Day (See Note Below)
- Independence Day (See Note Below)
- Labor Day (See Note Below)
- Election Day (6:00 AM until 8:00 PM the day of)
- Thanksgiving Day (See Note Below)
- Christmas Day (See Note Below)
- New Year’s Day (See Note Below)